Today the upper decks concrete floor is finished. The concrete is manually made at the ground level. The little crane in the pictures is used to lift it to the top. A long row of people is carrying the concrete to the final destination. Not efficient, but it works.
First |
Previous Picture |
Next Picture |
Last | Thumbnails